![]() | Up a level |
Aziz, Ade Asmi Abdul and Memon, Aftab Hameed and Rahman, Ismail Abdul and Karim, Ahmad Tarmizi Abd. (2013) Controlling Cost Overrun Factors in Construction Projects in Malaysia. Research Journal of Applied Sciences, Engineering and Technology, Vol.05 (08). pp. 2621-2629. ISSN 20407459
Permatasari, Putri Indah (2017) Analisis Pemilihan Alternatif Bekisting Pada Pekerjaan Pembetonan Balok, Kolom dan Pelat Ditinjau Dari Segi Biaya Dan Waktu. Tugas Akhir (S1) - thesis, UNIVERSITAS BAKRIE.
Rahman, Ismail Abdul and Memon, Aftab Hameed and Abdullah, Nor Hazana and Aziz, Ade Asmi Abdul (2013) Application of PLS-SEM to Assess the Influence of Construction Resources on Cost Overrun. Applied Mechanics and Materials, Vol284. pp. 3649-3656. ISSN 16609336
Sandra, Kirana (2021) ANALISA FAKTOR SEBAB DAN AKIBAT PEKERJAAN TAMBAH KURANG SERTA PENGENDALIAN TERHADAP BIAYA DAN WAKTU. Tugas Akhir (S1) - thesis, UNIVERSITAS BAKRIE.
Yazid, Yazid (2019) Analisis Dampak Perubahan Layout Ruang Parkir Dengan Tipe Pola Parkir Sudut 30 Pada Mal XYZ Terhadap Kapasitas Dan Pendapatan Parkir. Tugas Akhir (S1) - thesis, Universitas Bakrie.