Analisis dan Usulan Perancangan Tempat Penyimpanan Bahan Berbahaya dan Beracun (B3) dI PT XYZ

Azzahra, Diffa Laila (2024) Analisis dan Usulan Perancangan Tempat Penyimpanan Bahan Berbahaya dan Beracun (B3) dI PT XYZ. Tugas Akhir (S1) - thesis, Universitas Bakrie.

[thumbnail of Cover] Text (Cover)
00. Cover.pdf - Accepted Version

Download (138kB)
[thumbnail of BAB I-III] Text (BAB I-III)
01. BAB I-III.pdf - Accepted Version
Restricted to Registered users only

Download (531kB) | Request a copy
[thumbnail of BAB IV] Text (BAB IV)
02. BAB IV.pdf - Accepted Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB V] Text (BAB V)
03. BAB V.pdf - Accepted Version
Restricted to Registered users only

Download (22kB) | Request a copy
[thumbnail of BAB Daftar Pustaka] Text (BAB Daftar Pustaka)
04. BAB Daftar Pustaka.pdf - Accepted Version

Download (82kB)
[thumbnail of Lampiran] Text (Lampiran)
05. Lampiran.pdf - Accepted Version
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Hazardous and Toxic Materials commonly abbreviated as B3 are widely used for company production activities. PT XYZ is one of the EPC (Engineering, Procurement, and Construction) companies that utilizes B3 to support its activity processes such as cleaning activities in maintenance projects. The storage of B3 materials in this company is still not organized and mixed with the storage of other materials it can cause a risk of work accidents. In addition, the B3 storage area is not equipped with an emergency response system and MSDS (Material Safety Data Sheet) for each B3 material. B3 storage areas based on Government Regulation No. 74 of 2001 must be given symbols and labels and equipped with an emergency response system and B3 handling procedures. The purpose of this study is to improve the condition of B3 storage areas by designing B3 storage areas based on the 5S (Seiri, Seiso, Seiton, Sheiketsu, Shitsuke) concept and adjusting storage facilities to the anthropometry of workers. The methods used in this study include identifying B3 materials using the ABC method, 5S analysis of B3 storage areas using the 5W1H (What, Who, Why, When, Where, and How) method, anthropometric analysis of warehouse workers' bodies, and B3 storage area design plans according to applicable standards in Indonesia. The results of the research that has been conducted indicate that the B3 materials stored are dominated by flammable materials, the application of the 5S principle (Seiri, Seiso, Seiton, Sheiketsu, Shitsuke) in the B3 storage area is still lacking, the capacity of the B3 storage area is inadequate and the dimensions of the storage shelves are not ergonomic. Improvements that can be made by arranging B3 storage by applying the 5S principle, redesigning the dimensions of B3 storage shelves based on the anthropometry of warehouse workers, and completing aspects of the B3 storage area design plan according to standards including walls, floors, roofs, lighting systems, ventilation systems, B3 material storage layout, and emergency response systems.

Item Type: Thesis (Tugas Akhir (S1) - )
Uncontrolled Keywords: Hazardous and Toxic Materials (B3), 5S Principle, Anthropometry
Subjects: Environmental Science and Technology > Hazardous Materials
Thesis > Thesis (S1)
Divisions: Fakultas Teknik dan Ilmu Komputer > Program Studi Teknik Lingkungan
Depositing User: Diffa Laila Azzahra
Date Deposited: 23 Aug 2024 08:45
Last Modified: 23 Aug 2024 08:45
URI: https://repository.bakrie.ac.id/id/eprint/9898

Actions (login required)

View Item View Item