PERANCANGAN SISTEM PENGELOLAAN LIMBAH B3 (BAHAN BERBAHAYA DAN BERACUN) BENGKEL, SHOWROOM MOBIL DAN PERKANTORAN YANG BERKELANJUTAN

Susanti, Sonia Dewi (2026) PERANCANGAN SISTEM PENGELOLAAN LIMBAH B3 (BAHAN BERBAHAYA DAN BERACUN) BENGKEL, SHOWROOM MOBIL DAN PERKANTORAN YANG BERKELANJUTAN. Tugas Akhir (S1) - thesis, Universitas Bakrie.

[thumbnail of Cover] Text (Cover)
00. Cover.pdf - Accepted Version

Download (968kB)
[thumbnail of Latar Belakang, Metodologi] Text (Latar Belakang, Metodologi)
01. Bab I-III.pdf - Accepted Version
Restricted to Registered users only

Download (4MB) | Request a copy
[thumbnail of Pembahasan] Text (Pembahasan)
02. Bab IV.pdf - Accepted Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of Kesimpulan dan Saran] Text (Kesimpulan dan Saran)
03. Bab V.pdf
Restricted to Registered users only

Download (687kB) | Request a copy
[thumbnail of 04. Bab Daftar Pustaka.pdf] Text
04. Bab Daftar Pustaka.pdf

Download (597kB)
[thumbnail of Lampiran] Text (Lampiran)
05. Lampiran.pdf
Restricted to Registered users only

Download (1MB) | Request a copy

Abstract

Used oil and vehicle unit wash water are the waste with the largest volume in automotive workshop activities, so it requires special attention to the processing of liquid waste in the workshop. In practice, grey water at some points is still mixed with unit wash water which is contaminated with hazardous and toxic waste, increasing the pollutant load in the drainage path. This flow pattern risks reducing the performance of the processing unit of wastewater treatment. This study aims to design a plumbing installation for grey water and used unit wash water from the workshop separately to the Wastewater Treatment Plant (WWTP) and to determine the capacity of the Wastewater Treatment Plant (WWTP) with the Anaerobic-Aerobic biofilter method. The literature study method is a data collection method carried out by searching for information and data through documents related to the research topic. In this method, the author read and understood journals, books, regulations, and other documents related to the topic of the final project. The results of the study are in the form of a grey water design that is flowed to the equalization tank and the flow of used unit wash water from the workshop is flowed using a DN 100 mm PVC pipe to the oil trap and then continues to the equalization tank and WWTP. The main wastewater treatment plant consisting of four stages of initial sedimentation, anaerobic biofilter, aerobic biofilter, and final sedimentation with a capacity of 10.56 m3 is designed to be able to process wastewater effectively so that the resulting effluent meets the applicable quality standards and meets the hydraulic retention time requirements.

Item Type: Thesis (Tugas Akhir (S1) - )
Uncontrolled Keywords: Hazardous and toxic waste, greywater system plumbing, wastewater treatment
Subjects: Civil Engineering > Hydrology Engineering
Thesis > Thesis (S1)
Divisions: Fakultas Teknik dan Ilmu Komputer > Program Studi Teknik Sipil
Depositing User: Sonia Dewi Susanti
Date Deposited: 20 Feb 2026 06:38
Last Modified: 20 Feb 2026 06:38
URI: https://repository.bakrie.ac.id/id/eprint/13061

Actions (login required)

View Item View Item