Penerapan Metode Buit in Quality (BIQ) Untuk Mengurangi Kelolosan Core Reject dan Repair ke Proses Produksi Lanjut di PT. BUMM

Ren, Renaldi (2026) Penerapan Metode Buit in Quality (BIQ) Untuk Mengurangi Kelolosan Core Reject dan Repair ke Proses Produksi Lanjut di PT. BUMM. Tugas Akhir (S1) - thesis, Universitas Bakrie.

[thumbnail of COVER] Text (COVER)
00. Cover_1242923021_Renaldi_Skripsi.pdf - Accepted Version

Download (564kB)
[thumbnail of BAB I, II, III] Text (BAB I, II, III)
01. BAB I, II, III_1242923021_Renaldi_Skripsi.pdf - Accepted Version
Restricted to Registered users only

Download (897kB) | Request a copy
[thumbnail of BAB IV] Text (BAB IV)
02. BAB IV_1242923021_Renaldi_Skripsi.pdf - Accepted Version
Restricted to Registered users only

Download (1MB) | Request a copy
[thumbnail of BAB V] Text (BAB V)
03. BAB V_1242923021_Renaldi_Skripsi.pdf - Accepted Version
Restricted to Registered users only

Download (428kB) | Request a copy
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
05. DAFTAR PUSTAKA_1242923021_Renaldi_Skripsi.pdf - Accepted Version

Download (276kB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
06. LAMPIRAN_1242923021_Renaldi_Skripsi.pdf - Accepted Version
Restricted to Registered users only

Download (598kB) | Request a copy

Abstract

The high rate of defective core products (core rejects and core repairs) escaping to subsequent casting processes at PT BUMM reached an average of 3.97%, exceeding the company’s target of 1.00%. This condition reduces production efficiency and increases the risk of product failure. This study aims to identify the root causes of the problem and implement the Built-In Quality (BIQ) method to reduce the escape rate. Through the Fishbone Diagram and 5-Why Analysis, the root causes of the problem were identified as originating from human factors (low quality awareness), methods (lack of work standardization and collective final inspection), machines/tooling (suboptimal corebox design for PC 137 parts), and the environment (inadequate lighting). Improvements were implemented through BIQ pillars, including work standardization, visual management, per-piece self-inspection, corebox channel modification, additional lighting, and the implementation of stop-the-line authority. The results of the Two-Sample T-Test statistical analysis showed a value of [insert test result/p-value], indicating that the implementation of BIQ significantly reduced the escape rate from 4.16% to 0.64% and achieved the target of below 1.00%, with a stable production process. Keywords: Built-In Quality (BIQ), Quality Control, Core Reject, Core Repair, Metal Casting, Work Standardization.

Item Type: Thesis (Tugas Akhir (S1) - )
Uncontrolled Keywords: Built-In Quality (BIQ), Pengendalian Kualitas, Core Reject, Core Repair, Pengecoran Logam, Standarisasi Kerja.
Subjects: Industrial & Manufacturing Engineering
Industrial & Manufacturing Engineering > Quality control (Pengendalian mutu / Quality Control)
Thesis > Thesis (S1)
Divisions: Fakultas Teknik dan Ilmu Komputer > Program Studi Teknik Industri
Depositing User: Renaldi Renaldi
Date Deposited: 18 Sep 2026 04:12
Last Modified: 18 Sep 2026 04:12
URI: https://repository.bakrie.ac.id/id/eprint/14904

Actions (login required)

View Item View Item